Randy and Kerri; I'm thrilled. Attached are the pictures of my install in Paso Robles. The garage floor was a mess. Now the floor looks so good, I feel I need to repaint the walls. My delivery arrived yesterday as promised. I started cleaning up the garage and getting things cleared out of the way at about 10am this morning. By 12:15pm, I was taking photos to show the results of my work. Installing the first row of tiles required a little thought and some time down on my knees. Beyond that, I simply positioned a tile and locked it in place with a couple of taps of my shoe. The remaining work to be done is cutting tiles for a side wall and the rear wall. I expect this to go easily as well.
Regarding the edges. I ordered 12 edges total. I had about 30 of the "8" shaped connectors, which allowed me to use 2 per edge. Is this proper, or should the shaped connectors be used on each pin of the edge? Thanks Again, Larry Czapla (chop-la)
|
![]() ![]() ![]() |
|